Abstract

Purpose: Research has shown that construction contractors face challenges when attempting to manage their present and future financial requirements via cash flow (CF) forecasting and/or the use of cash flow forecasting (CFF) models. Consideration for risk factors impacting on CF forecasts/CFF models has also been identified as a key issue affecting contractors’ application of CFF models. This study assessed the risk factors prevalent in the idiographic setting ofrenovations of primary health care buildings in Kaduna state Nigeria.
Design/Methodology: A list of risk factors that impact on CF forecasts were identified through the review of existing literature. The identified risk factors were then investigated in relation to the likelihood of occurrence and the impact on CF forecasts, if they occur. Data was collected via a questionnaire survey of contractors who had been engaged in carrying works of renovating primary health care (PHC) buildings in Kaduna state Nigeria. The questionnaire survey focused on determining the likelihood of occurrence/impact of thirty-one (31) risk factors on cash-out forecasts. Contractors were asked to rank on a scale of 0 to 5 the likelihood of occurrence/impact of the risk factors. The responses obtained were subjected to analysis with the use of IBM SPSS (version 21) software. The mean, standard error and standard deviation were computed. The computed means were used to rank the likelihood of occurence/impact of the factors in decending order.
Findings: Nineteen (19) risk factors were found to significantly impact cash-out forecasts- “change in management”, “non-inclusion of project in yearly budget”, “increased duration of the project”, “change in currency exchange rates”, “high cost of materials”, among others.
Research Implications: The findings from the research imply that several risk factors have different degree of occurrence on cash-out forecasts in, and different degree of impacts on cash-out forecasts in the Nigerian construction industry.
Originality/Value: Construction contractors carrying out renovation works in Kaduna state Nigeria should expect positive variations to their “cash-out” forecasts during the execution of projects. Major recommendations include; contractors should carefully consider the nineteen (19) risk factors affecting “cash-out” before embarking on any construction renovation project. 

References

  1. Abdulrazaq, M., Ibrahim, Y. M. and Ibrahim, A. D. (2017). Prioritisation of Risk Factors Impacting on Construction Contractors Cash out Forecasts in Nigeria. Nigerian Journal of Technological Research (NJTR). 12 (2), 73 -79.
  2. Aibinu, A.A., and Jagboro, G.O. (2002). The Effects of Construction Delays on Project Delivery in Nigerian Construction, International Journal of Project Management, 20, 593-599.
  3. Aris, N.M., Sokat, N. and Sahari, S. (2020). The Moderating Effect of Government Ownership on the Relationship between Cash Flow and Firms' Performance for Construction Industry in Malaysia. International Journal of Academic Research in Accounting, Finance and Management Sciences. 10 (3), 52-63.
  4. Balkau, B.J. (1975). A financial model for public works programmes. Paper to National ASOR Conference, Sydney, August 25-27.
  5. Betts, M., and Gunner, J. (1993). Financial Management of Construction Projects: Cases and Theory in the Pacific Rim. Longman, Singapore.
  6. Blyth, K., Lewis, J. and Kaka, A. (2006). A novel multiple linear regression model for forecasting S-curves. Engineering, Construction and Architectural Management, 13 (1),82–95.
  7. Boussabaine, A.H. and Elhag, T. (1999). Applying fuzzy techniques to cash flow analysis. Construction Management and Economics, 17 (7), 745–55.
  8. Boussabaine, A. H. and Kaka, A. P. (1998). A neural networks approach for cost-flow forecasting. Construction Management and Economics, 16 (4), 471–479.
  9. Bromilow, F.J. and Henderson, J.A. (1978). Procedures for Reckoning the Performance of Construction Contracts, 2nd ed. Commonwealth Scientific and Industrial Research Organisation, Division of Building Research, Highett, Australia.
  10. Buertey, J. T. I., Adjei-Kumi, T. and Amoah, P. (2010). Construction cash Flow Prediction Model in Ghana: A Case Study of the District Assembly Common Funded Project. In: Laryea, S., Leiringer, R. and Hughes, W. (Eds)Procs West Africa Built Environment Research (WABER) Conference, 27-28 July 2010, Accra, Ghana, 235-245.
  11. Chaharsooghi, S. K., Sariqayab, M. S. and Rahimnezhad, F. (2019). Optimisation of Project Cash Flow under Uncertainty by Genetic Algorithm, International Journal of Industrial Engineering & Management Science, 6 (1), 24-37
  12. Chen, M.,WU, Y., Dan, L. T. and Rey, A. F. V (2013). Enhanced Time-Dependent Evolutionary Fuzzy Support Vector Machines Inference Model For Cash Flow Prediction And Estimate At Completion, International Journal of Information Technology and Decision Making, 12 (169).
  13. Cui, Q., Hastak, M. and Halpin, D. (2010). System Analysis of Project Cash Flow Management Strategies, Construction Management and Economics, 28, 361-376.
  14. Dantata, S. (2007). General Overview of the Nigerian Construction Industry, M.Eng Thesis, Department of Civil and Environmental Engineering, B.S., Massachusetts Institute of Technology.
  15. Dusai A. K. (2011). An Appraisal of the Causes of delayed Payments in Public Construction Projects in Nigeria, BSc Project, Department of Quantity Surveying, Ahmadu Bello University, Zaria-Nigeria.
  16. Evans, R. C. and Kaka, A. P. (1998). Analysis of the accuracy of standard/average value curves using food retail building projects as case studies. Engineering, Construction and Architectural Management, 5 (1). 58-67.
  17. Flanagan, R. and Norman, G. (1993). Risk Management and Construction. Blackwell Science, London.
  18. Fong, S. W. (1987). Risk management. The Cost Engineer, 25, 12-16.
  19. Healey, J. R (1982). Contingency funds evaluation, Transaction of American Association of Cost Engineers, B3 1-B3 4.
  20. Honoabu, K. (2005). Cash flow prediction on construction contracts in Ghana – The formula approach, The Quantity Surveyor. 50(1), 31-35.
  21. Hoseini, A., Andalib, R., and Behrouz, G. (2015) stochastic Framework for Cash Flow Forecasting Considering Owner's Delay in Payment by Use of Monte Carlo simulation. In: 51st ASC Annual International Conference Proceedings, 22-25 April, 2015, Texas A&M University, College Station, Texas. Association of Researchers in Construction Management.
  22. Jiang, A., Issa, R. R. A and Malek, M. (2011). Construction Project Cash Flow Planning Using the Pareto Optimality Efficiency Network Model, Journal of Civil Engineering and Management, 17 (4), 510-519.
  23. Kaka, A.P and Khosrowshahi F. (1996). Effect of Different Procurement routes Contractors' Cash Flows. Engineering, Construction and Architectural Management, 3(1, 2), 133 145.
  24. Kaka, A. and Khosrowshahi, F. (2008). A Mathematical-Based model for Company-Level Budgeting Incorporating Future Unknown Contracts Construction Management and Economics, 16 (1), 48–60.
  25. Kaka, A. and Price, A.D. (1991). Net cash flow models: are they reliable? Construction Management and Economics, 9 (3), 291–308.
  26. Kenley, R. (2003). Financing Construction- cash flows and cash farming, Spon Press, New York.
  27. Kenley, R. and Wilson, O.D. (1986). A construction project cash flow model—an idiographic approach. Construction Management and Economics, 4(3), 213–232.
  28. Kenley, R. and Wilson, O.D. (1989). A construction project net cash flow model, Construction Management and Economics, 7, 3-18.
  29. Khosrowshahi, F. (2000). A Radical Approach to Risk in Project Financial Management. In: Akintoye, A. (Ed.). 16th Annual ARCOM Conference, 6-8 September, 2000, Glasgow Caledonian University. Association of Researchers in Construction Management, 2, 547-556.
  30. Kirkham R. J., Boussabaine, A. H. and Kirkham, P. M. (2002). Stochastic Time Series Forecasting of Electricity Costs in an NHS Acute Care Hospital Building, for Use in Whole Life Cycle Costing, Engineering, Construction and Architectural Management,9 (1), 38-52.
  31. Liang, Y., Ashuru, B. and Li, M. (2021). Forecasting the Construction Expenditure Cash Flow for Transportation Design-Build Projects with a Case-Based Reasoning Model. Construction Engineering and Management. 147 (6), 04021043.
  32. Lowe, J. G. (1987). Cash flow and the construction client -a theoretical approach. In Lansley, P. R. and Harlow, P. A. (Eds.). Managing Construction Worldwide, E& FN Spon, London, J.
  33. Mahmoud, H., Ahmed, V. and Behery, S. (2021). Construction Cash Flow Risk Index. Journal of Risk and Financial Management. 14 (269), 1406269.
  34. Mishkawi, Z. (1989). An S0curve Equation for Project Control. Construction Management and Economics,7, 115–124.
  35. Moavenzadeh, F. and Rossow, J. (1976). Risks and risk analysis in construction management. Proceeding of the CIB W65, Symposium on Organisation and Management of Construction, US National Academy of Science, Washington DC, USA, 19-20 May.
  36. Motawa, I. and Kaka, A. P. (2009). Modelling Payment Mechanisms for Supply Chain in Construction. Engineering, Construction and Architectural Management, 16 (4), 325 336.
  37. Odeyinka, H. A. (2003). The Development and Validation of Models for Assessing Risk Impacts on Construction Cash Flow Forecasts. Unpublished PhD Thesis, Glasgow Caledonian University, Glasgow.
  38. Odeyinka, H. A., Lowe, J. G. and Kaka, A. (2002). A construction Cash Flow Risk Assessment Model. In: Greenwood, D (Ed)., 18th Annual ARCOM Conference, 2-4 September, 2002, University of Northumbria. Association of Researchers in Construction Management, 1, 3-12.
  39. Odeyinka, H. A., Lowe, J. G. and Kaka, A. (2008). An Evaluation of Risk Factors Impacting Construction Cash Flow Forecasts. Journal of Financial Management of Property and Construction, 13(1), 5-17.
  40. Odeyinka, H. A, Lowe, J. and Kaka, A. (2013). Artificial Neural Network Cost Flow Risk Assessment Model, Construction Management and Economics, 31 (5), 423-439.
  41. Odeyinka, H. A. and Ojo, G. K. (2007). A Conceptual Framework for Assessing Risk Impacts on Clients' Cash Flow. In: The 3rd conference for Postgraduate Research of the Built and Natural Environment (PRoBE), Glasgow Caledonian University, Glasgow, UK... 10pp (Conference Contribution).
  42. Ogunsemi, D. R. (2000). Cost Implications of Risk Factors on Construction Projects in Nigeria. Journal of Applied Sciences, 13 (2), 917-923.
  43. Ogunsemi, D. R. and Jagboro, G.O (2006). Time-Cost Model for Construction Projects in Nigeria. Construction Management and Economics, 24 (3), 253-258.
  44. Ojo GK (2010): An assessment of risk impacts on construction clients' cash flow forecast, Ph.D. Thesis, Department of Quantity Surveying, Obafemi Awolowo University, Ile-Ife
  45. Olawale, Y, and Ming, S. M. (2009). A Survey of Construction Project Cost and Time Control Practices in the UK. In: Dainty, A. (Ed) Procs 25th Annual ARCOM Conference, 7-9 September, 2009, Nottingham, UK, Association of Researchers in Construction Management, 877-86.
  46. Park, H.K., Han, S. H. and Russell, J. S. (2005). Cash Flow Forecasting Model for General Contractors Using Moving Weights of Cost Categories, Journal of Management in Engineering, 2 (4), 164-172
  47. Peer, S. (1982). Application of cost-flow forecasting models. ASCE Journal of Construction Division, 108(2), 226–32.
  48. Perry J. G. and Hayes, R. W. (1985). Risk and its management in construction projects. Proceedings of Institution of Civil Engineers, Part 1, June, 78,499-521.
  49. Ross, A., Dalton, K. and Sertyesilisik, B. (2013). An Investigation on the Improvement of Construction Expenditure Forecasting, Journal of Civil Engineering and, 19 (5), 759 - 771
  50. Tucker, S.N. (1986). Formulating construction cash flow curves using a reliability theory analogy. Construction Management and Economics, 4 (3), 179–88.
  51. Zayed, T., Liu, Y. (2014). Cash Flow Modelling for Construction Projects, Engineering, Construction and Architectural Management, 21 (2), 170-189.
How to Cite

Abdulrazaq, M., Mohammed, S. M., & Ibrahim, M. K. (2021). AN IDIOGRAPHIC APPROACH TO ASSESSING RISK FACTORS IMPACTING ON CONSTRUCTION CONTRACTORS’ CASH OUT FORECASTS. Journal of Contemporary Research in the Built Environment, 5(1), 43-55. https://doi.org/10.68128/jocrebe.2021.ucs0nfru

M. Abdulrazaq, S. M. Mohammed, and M. K. Ibrahim, "AN IDIOGRAPHIC APPROACH TO ASSESSING RISK FACTORS IMPACTING ON CONSTRUCTION CONTRACTORS’ CASH OUT FORECASTS," Journal of Contemporary Research in the Built Environment, vol. 5, no. 1, pp. 43-55, March 2021. doi: 10.68128/jocrebe.2021.ucs0nfru

Share this article:
Facebook X / Twitter LinkedIn