Research Article

APPRAISING THE FACTORS INFLUENCING THE USE OF E-PROCUREMENT IN NIGERIAN CONSTRUCTION INDUSTRY

1 Department of Quantity Surveying, Federal University of Technology, Akure, Ondo State
2 Department of Built Environment, University of Wolverhampton, United Kingdom
3 Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria
* Corresponding author: olusolaolatunji89@gmail.com
Published: Mar, 2020
Pages: 17-35
Views: 30
Downloads: 9

Abstract

Purpose: The fragmentation in the Nigerian construction industry is often seen as one out of many contributors to low productivity in construction and has led to well-documented problems with both communication and information processing. In Nigeria, Procurement over the years has been carried out manually and it has been distinguishingly characterized by large paperwork, high cost, corruption, and delay in procurement process. For this reason, this paper x-ray the factors influencing the use of E-procurement in the Nigerian construction industry. Design/methodology/approach: Quantitative data were collected from construction professionals. The data were analysed using Mean Item Score (MIS) and Kruskal-Wallis H Test.Findings: The most important risk factors influencing e-procurement in the Nigerian construction industry are safety and insecurity issues, the unreliability of technology, reduced level of personal contact, resistance to change among others. It is established from the study that E-procurement implementation can be expensive among construction firms in Nigeria. The factors influencing the use of E-procurement in the Nigerian construction industry the ease of transitioning from paper to electronic systems as the most important factor influencing the adoption of e-procurement followed by availability of policies to promote e-procurement, and then by the cost of e-procurement technology. Practical implication: The paper provides procurement managers with relevant factors that influence the adoption decision. This highlights the importance of maximizing the benefits of e-procurement system for potential users to facilitate the adoption process.
Originality/value: The paper complements the existing literature review about the use of e procurement in the construction industry. 

References

  1. Aberdeen Group. (2002). Best Practices in e-Procurement. The Abridged Report, Aberdeen Group Inc, Boston, Massachusetts, 65.
  2. Aberdeen Group. (2008). Global Supply Management (GSM): the 2008–2009 Agenda. (2017, May 28). Retrieved from http://www.aberdeen.com
  3. Aberdeen Group. (2009). Global Supply Management (GSM): the 2009–2010 Agenda. (2017, May 28). Retrieved from http://www.aberdeen.com
  4. Aduwo, E.B., Ibem, E.O., Uwakonye O.U., Olayeni, P.T., & Ayo-Vuaghan, E.K., (2016). Barriers to the uptake of e-Procurement in the Nigerian building industry. Journal of Theoretical and Applied Information Technology. ISSN: 1992-8645. (2017, May 15). Retrieved from http://www.jatit.org
  5. Aduwo, E.B., Ibem, E.O., Tunji-Olayeni, P., Uwakonye; O.U., & Ayo-Vuaghan, E.K. (2016). Barriers to the Uptake of e-Procurement in the Nigerian Building Industry. International Journal of Applied Theoretical and Applied Information Technology IJATAIT, 89.
  6. Achuora, J., Arasa, R., & Ochiri, G. (2012). Precursors to effectiveness of public procurement audits for Constituency Development Funds (CDF) in Kenya. European Scientific Journal, ESJ, 8(25).
  7. Afolabi, O.A. (n.d.) E-maturity of stakeholders for web based procurement platform in the construction industry
  8. Agboyi, M. R., & Ackah, D. (2012). The impact of E-procurement on the improvement of an Organization.
  9. Angappa, G., Ronald, E., Eric, W.T., Bharantendra, K. (2009). E-procurement adoption in the southcoast S.M.Es. Production Economics 122, 161-175.
  10. Asian Development Bank. (2013). E-Government Procurement Handbook. Mandaluyong City, Philippines. (2017, May 28). Retrieved from http://www.adb.org/egovernment-procurement-handbook
  11. Aslani, M. P., Laios, L. G., & Moschuris, S. J. (2008). The perceived impact of e-procurement in EU enterprises. International Journal of Value Chain Management, 2(2), 168-187.
  12. Azanlerigu, J. A., & Akay, E. (2015). Prospects and Challenges of E-Procurement in Some Selected Public Institutions in Ghana. Prospects, 7(29).
  13. Baily, P., Farmer, D., Crocker, B., Jessop, D., & Jones, D. (2008). Procurement principles and management. Pearson Education. England: Prentice Hall
  14. Bikshapathi, K. (2006). Implementation of e-procurement in the Government of Andhra Pradesh: A Case Study. E-Governance: Case Studies, 270-285.
  15. Bowden, S. (2005) Application of mobile IT in construction. Dissertation, University of Loughborough, Department of Civil & Building Engineering
  16. Callender, G., Sajeev, A. S. M. & Kishor, V. (n.d.) Critical factors that influence E-procurement Implementation success in the Public Sector.
  17. Chomchaiya, S. (2014). Consolidated Performance Measurement framework for government e-procurement focusing on internal stakeholders. Accessed July 18, 2017, from https://www.deepdyve.com/lp/emerald-publishing
  18. Clifford, M. & Alexandru V. (2012). E-procurement; A myth or reality? Volume 12, issue 2, 212-258, summer.
  19. COBRA. (2009). The Construction and Building Research Conference of the Royal Institution of Chartered Surveyors Held at the University of Cape Town, 10-11 September 2009
  20. Creswell, J. W. (2003). Research design: Qualitative, quantitative, and mixed method approaches I by John W. Creswell 1.-2nded.
  21. Croom, S., & Brandon-Jones, A. (2007). Impact of e-procurement: experiences from implementation in the UK public sector. Journal of Purchasing and Supply Management, 13(4), 294-303.
  22. Croom, S., & Johnston, R. (2003). E-service: enhancing internal customer service through eprocurement. International Journal of Service Industry Management, 14(5), 539-555.
  23. Davila, A., Gupta, M., & Palmer, R. (2003). Moving procurement systems to the internet: The adoption and use of e-procurement technology models. European management journal, 21(1), 11-23.
  24. De-Boer, L., Harink, J., & Heijboer, G. (2002). A conceptual model for assessing the impact of electronic procurement. European Journal of Purchasing & Supply Management, 8(1), 25-33.
  25. Desmond, A. (2016). Implementation and adoption of E-Procurement in Ghana Public Sector: the way forward. PhD Thesis, from the Department of Building Technology, College of Art and Built Environment, Ghana.
  26. E-Business W@tch. (2005). Sector Report No. 08-I (July 2005) ICT and Electronic Business in the Construction Industry, Key issues and case studies.
  27. Eadie, K. S., Hussain, W., & Mustaffa, N. (2012). Survey on benefits and barriers of e-procurement: Malaysian SMEs perspective. International Journal on Advanced Science and Engineering Information Technology, 2(6), 424-429.
  28. Eadie, R., Perera, S., Heaney, G., & Carlisle, J. (2007). Drivers and barriers to public sector eprocurment within Northern Ireland's construction industry. Journal of Information Technology in Construction, 12(2), 103-120.
  29. Eakin, D. (2003). Measuring e-Procurement benefits. Summit: Canada's magazine on public sector purchasing, United Kingdom.
  30. Eric, K. A. & Bingunath, I. (2011). Exploring e-bussiness technology to support improvement in the infrastructure procurement process in Ghanaian Construction Industry.
  31. Esben, S. (2012). Promoting the use of ICT in the construction industry; Assessing the factors hindering usage by building contractors in Ghana. September, 2012.
  32. Fahad U. (2013). Types of Procurement Contract used in project Management. Retrieved July 18, 2017, from https://pmstudycircle.com/2013/12/types-of-procurement-contracts-usedin-project-management/
  33. Fernandes, T., & Vieira, V. (2015). Public e-procurement impacts in small and medium enterprises. International Journal of Procurement Management, 8(5), 587-607.
  34. Ferreira, J. & Spinola R. (2013). The Potential of e-Tendering Data to Improve Post-Award Contract Management. Journal of Suppliers, 9(5), 43–46.
  35. Fischer, M. and J Kunz (2004). "The Scope and Role of Information Technology in Construction." CIFE Technical Report 156, Stanford University.
  36. Fleming, E. D., Kuo, C. C., & White, R. E. (2010). Funding e-procurement initiatives in US Government agencies: challenges, models, and trends. International Journal of Procurement Management, 3(3), 231-246.
  37. Gupta, M., & Narain, R. (2012). Investigation into barriers to adoption of e-procurement and measures of performance. International Journal of Procurement Management, 5(5), 567- 607.
  38. Harris, F. and MacCaffer, R. (2001): "Modern Construction Management." London: Blackwell Science -5 th edition.
  39. Hassan, T. M. and McCaffer R. (2002) Vision of the large scale engineering construction industry in Europe, Automation in Construction, Vol.11, No.4, 421- 437.
  40. Hore, A.V. (2006): Use of it in managing information and data on construction projects – a perspective for the Irish construction industry. Information Technology in Construction Project Management Engineers Ireland Project Management Society Talk: 21st March 2006
  41. Hore, A.V and West, R.P. (2005). "Attitudes towards Electronic Purchasing in the Irish Construction Industry", 2005 CIB W92/T23/W107 International Symposium on Procurement Systems, Las Vegas, USA.
  42. Ibem, E. O., Aduwo, E. B., Tunji-Olayeni, P., Ayo-Vaughan, E. A., & Uwakonye, U. O. (2016). Factors influencing e-Procurement adoption in the Nigerian building industry. Construction Economics and Building, 16(4), 54-67.
  43. Ibem, E. O., & Laryea, S. (2015). E-Procurement use in the South African construction industry. Journal of Information Technology in Construction (ITCon), 20(23), 364-384.
  44. Isikdag, U., Underwood J., Kuruoglu M. & Acikalin U. (2007) The Strategic Role of ICT within the Turkish AEC Industry. Proceedings of CIB W89: International Conference on Building Education and Research -Building Resilience-. (Haigh R. and Amaratunga D., editors), Kandalama, Sri Lanka.
  45. Issa, R. R. A., Flood, I., & Caglasin, G. (2003). A survey of e-business implementation in the US construction industry. Journal of Information Technology in Construction (ITCon), 8(2), 15-28.
  46. Johnson, M. (2011). Public sector e-procurement: a study of benefits from e-markets in the local government sector. International Journal of Services Technology and Management, 16(1), 1-27.
  47. Kidd, A. (2013). The Definition of Procurement. Chartered Institute of Purchasing Supply: Australia Pty Ltd. (2017, July 18). Retrieved from https://www.cipsa.com.au/
  48. Kothari, C.R. (2004). Research Methodology Methods and Techniques (Second Edition). An Imprint of New Age International Limited.
  49. Lófgren, A. ( 2007) . ICT Investment Evaluation and Mobile Computing Business Support for Construction Site Operations. Royal Institute of Technology, Sweden
  50. Lou, E. C. W., & Alshawi, M. (2010). Critical success factors for e-tendering implementation in construction collaborative environments: people and process issues. Journal of Information Technology in Construction (ITcon), 14(10), 98-109.
  51. Love, P.E.D., Li, H. and Mandal, P., (1999). Rework: a symptom of a dysfunctional supply-chain, European Journal of Purchasing and Supply Management, 5, 1-11.
  52. MacManus, S. A. (2002). Understanding the incremental nature of e-procurement at the state and local levels. Journal of Public Procurement, 2(1), 5.
  53. Maia, S. & Tavares, L. V. (2013). Public procurement re-examined. Journal of Public Procurement. 1(1), 9–50.
  54. Mathonsi, M. D., & Thwala, W. D. (2012). Factors influencing the selection of procurement systems in the South African construction industry. African Journal of Business Management, 6(10), 3583.
  55. Moon, M. J. (2005). E-procurement management in state governments: diffusion of eprocurement practices and its determinants. Journal of Public Procurement, 5(1), 54.
  56. Naoum, S, G (2002). Dissertation research and writing for construction students, Butterworth Heinemann.
  57. Murray M., Nkado R. & Lai A. (2001). The integrated use of information technology in the construction industry. Proceedings of the CIB 78 Conference: IT in Construction in Africa,Pretoria, South Africa, 39-1 to 39-13.
  58. NCC. (2017). Nigeria's Fastest Growing Telecommunication Company. (2017, May 28). Retrieved from https://www.pressreader.com/canada/torontostar/20170216/282071981659100
  59. Neef, D. (2001). E-Procurement: From strategy to implementation. FT press.
  60. Neupane, A., Soar, J., Vaidya, K., & Yong, J. (2012, August). Role of public e-procurement technology to reduce corruption in government procurement. In Proceedings of the 5th International Public Procurement Conference (IPPC5) (pp. 304-334). Public Procurement Research Centre.
  61. Norzaid,i M., Nurliyana, M., Arlina, E. & Intan, S. (2013). Factors influencing the usage of E-procurement among construction companies in Malaysia. University Teknologi MARA, Malaysia
  62. Ofori, G. (2000) Challenges of Construction Industries in Developing Countries, 2nd International Conference on construction in Developing Countries: Challenges facing theconstruction industry in developing countries, 15 –17 November, Gabarone, Botswana.
  63. Oladapo, A.A. (2006). The impact of ICT on professional practise in the Nigerian in the Nigerian Construction Industry. The Electronic Journal of Information Systems in Developing Countries, 24.
  64. Olusegun, B. S. (2017). Investigating Factors Affecting E-Government Procurement (E-GP) Acceptance Domain Among Nigerian Small And Medium Enterprises.
  65. Oyediran, O. S., & Akintola, A. A. (2011). A Survey of the State of the Art of E-Tendering in Nigeria. Journal of Information Technology in Construction ITcon, 16(32), 557-576.
  66. Panda, P., & Sahu, G. P. (2012). E-Procurement implementation: critical analysis of success factors' impact on project outcome.
  67. Parida, U., & Parida, V. (2005). E-procurement: an Indian and Swedish perspective. (2017, May 6). Retrieved from http://www.epubl.ltu.se/1404-5508/.
  68. Peansupap, V. & Walker D. (2005). Factors enabling information and communication technology diffusion and actual implementation in construction organizations. Journal of Information Technology in Construction (ITcon), Vol. 10, No. 14, 193-218.
  69. Perreira, C.S. & Saores, AL. 2007. Improving the quality of collaboration requirements for information management through social networks analysis. International Journal of InformationManagement, 27: 86-103.
  70. Pollaphat, N., Skibniewski, M. (2004). Web based construction project management systems: How to make them successful. Automation in construction, 491-506.
  71. Price Water House Coopers. (2007). E-Procurement the golden book for good practice procurement. (2007, May 6). Retrieved from http://pwcglobal.com/eprocgoldenbook.
  72. Quangdung, T., Dechun, H., Liu, B. & Hossain, E. (2011). A construction enterprise's readiness level in implementing E-procurement: A system engineering assessment model.
  73. Rankin, J. H., Chen, Y., & Christian, A. J. (2006). E-procurement in the Atlantic Canadian AEC industry. Journal of Information Technology in Construction (ITcon), 11(6), 75-87.
  74. Samuelson, O. (2008). The IT-barometer – A decade's development of IT use in the Swedish construction sector. Journal of Information Technology in Construction (ITcon), 13(1), 1-19.
  75. Skibniewski, M. J. and Nitithamyong, P. (2004). Web-based Construction Project Management Systems: Practical Advantages and Disadvantages. Proceedings of the 4th International Conference on Construction Project Management (ICCPM), Singapore, Nanyang Technological University.
  76. Subramaniam, C., & Shaw, M. J. (2002). A study on the value of B2B e-commerce: The case of Web-based procurement. E-Business Management, 439-461.
  77. Tatsis, V., Mena, C., Van Wassenhove, L. N., & Whicker, L. (2006). E-procurement in the Greek food and drink industry: drivers and impediments. Journal of Purchasing and Supply management, 12(2), 63-74.
  78. Tavares, L. V. (2012). Management of public purchasing: guidelines for the application of the new Public Procurement Code - Decree-Law 18/2008. Lisbon.
  79. Tenah, K. A. (1986). Information needs of construction personnel. Construction Engineering and Management 112.
  80. Teo, T. S. H., Srivastava, S. C. & Jiang. (2009). Trust and electronic government success: An empirical study. Journal of Management Information Systems, 25(3), 99-131.
  81. UN Procurement Practitioner's Handbook. (2012). The Glossary of Terms, Interagency Procurement Working Group. 5th edition. Pp 80.
  82. Vadhavkar, S.; Pena-Mora, F. (2000) Geographically Distributed Team Interaction Space. Computing in Civil & Building Engineering, Proceedings of the Eighth International Conference, ASCE, Virginia.
  83. Vconnect. (2018).
  84. Waziri, A., Ali N., Ghali, A., & Zaimi, (2015). Environment variables on IT adoption: A case of Nigerian construction organizations. April (2015).
  85. Weele, Van, J. A (2010). Procurement and supply chain management, 5th Edition, Thomson International, London, England, 147.
  86. Wolsepp, Stefan Wolsepp, & Olofsson, T. (2006). "Using Virtual Reality in a Large-Scale Industry Project", ITcon Vol. 11 (2006), Wolsepp and Olafsson, pg. 627
  87. World Bank. (2003). Procurement for Projects and Programs, E-procurement, Journal of bank procurement. 5(6), 38-45
  88. World Bank. (2006). Procurement guideline: procurement of Goods, Works, and NonConsulting Services under IBRD Loans and IDA Credits & Grants. 1818 H Street N.W. Washington, D.C. 20433.
  89. Wyld, D. (2006). Constraints to Effective Implementation of E-Procurement in the Public. Management Research News. 5, 45.
How to Cite

Olatunji, S. O., Oladinrin, T. O., & Jegede, B. E. (2020). APPRAISING THE FACTORS INFLUENCING THE USE OF E-PROCUREMENT IN NIGERIAN CONSTRUCTION INDUSTRY. Journal of Contemporary Research in the Built Environment, 4(1), 17-35. https://doi.org/10.68128/jocrebe.2020.ylmgjivo

S. O. Olatunji, T. O. Oladinrin, and B. E. Jegede, "APPRAISING THE FACTORS INFLUENCING THE USE OF E-PROCUREMENT IN NIGERIAN CONSTRUCTION INDUSTRY," Journal of Contemporary Research in the Built Environment, vol. 4, no. 1, pp. 17-35, March 2020. doi: 10.68128/jocrebe.2020.ylmgjivo

Share this article:
Facebook X / Twitter LinkedIn