Research Article

COLLABORATION AMONG INTERNAL STAKEHOLDERS OF CONSTRUCTION PROJECTS IN NIGERIA

1 Department of Building, Faculty of Environmental Sciences, University of Jos, Jos, Nigeria
* Corresponding author: jurbenang@yahoo.com
Published: Sep, 2019
Pages: 17-29
Views: 29
Downloads: 5

Abstract

Purpose: Construction project delivery in Nigeria, like many developing countries, remains challenging in terms of collaborative effort. It is still seen to be characterised by adversarial relationships in work places thereby manifesting unsatisfactory work quality, errors and omissions in designs and other contract documents, wastages and attendant high costs, and untimely completion. Efforts have been made in understanding the practices and barriers of collaboration. This research investigated internal stakeholder participation and involvement in decision making, and evaluated the degree of collaboration in terms of prevalent collaborative elements, efforts and strategies in construction industry in Nigeria. Design/methodology/approach: Questionnaire Survey was used to collect data for the study from the six cities representing the six geopolitical Zones of Nigeria as cluster sampling drawn from internal stakeholders: Client (or client representative), builders, engineers, architects, quantity surveyors, land surveyors and skilled technicians. Simple percentages and mean were used from the SPSS as tools for analyses. Findings: It was found that collaboration takes place mostly at construction phase instead of all phases; skilled technicians (with Mean Score of 4.30) and client/client representative (with Mean Score of 4.26) are mostly involved in decision making instead of holistic involvement. Originality/value: The understanding of what the issues are with Stakeholder collaboration in Nigeria has been established and adjudged to be generally on the average. It is recommended that level of internal stakeholder involvement should be encouraged by all stakeholders at all phases of construction and the key elements of collaboration should be prioritised alongside collaborative efforts and strategies for less adversarial relationships and improved productivity in construction industry in Nigeria.

References

  1. Alufohai, A. J. (2012). Adoption of Building Information Modelling and Nigeria's quest. Retrieved February 17, 2016 from www.fig.net/…rs/ts08i/TS08J_alufohai_6225.pdf
  2. Ballard, H. G. (2000). The Last Planner System of Production Control. Doctoral dissertation, the University of Birmingham. Retrieved February 17, 2016 fromhttp://www.leanconstruction.org/pdf/ballard2000-dissertation.pdf
  3. Barrat, M. (2004). Understanding the meaning of collaboration in the supply chain. Supply chain management: An international journal 9 (1), 30-42. doi: 10.1108/13598540410517566
  4. Berg, L., B. (2007). Qualitative Research Methods for the Social Sciences. (6th ed.). London, UK: Pearson Education
  5. Construction Users Roundtable - CRT (2004). Collaboration, integrated information, and the project life cycle in Building design, construction and operation. Retrieved February 17, 2016 from www.curt.org
  6. Creswell, J.W. ( 2014.) Research Design: Qualitative, quantitative, and mixed methods Approaches (4th ed.). London, UK: Sage Publication
  7. Dada, M.O. (2013). Analysis of conflict centres in projects procured with traditional and integrated methods in Nigeria. International project of construction supply chain management 3 (1), 1-15
  8. Darrington. J., Dunne, D. & Lichtig, W. (2010). Managing integrated project delivery systems: Organising, operating system and commercial terms. Retrieved February 17, 2016, from www.cmaanet.org/managing_integrated_project_delivery_systems.pdf
  9. Dave, B. & Koskela, L. (2002). Collaborative Knowledge Management: A Construction Case Study. Salford Centre for Research and Innovation, University of Salford, Maxwell Building, Greater Manchester, UK. Retrieved February 17, 2016,from http://www.usir.salford.ac.uk.
  10. Frey, B.B., Lohmeier, J.H., Lee, S.W. & Tollefso N. (2006). Measuring collaboration among grant partners. American Journal of Evaluation, 27(1), 383-392. Doi: 10.1177/1098214006290356
  11. Gould, F.E. & Joyce N.E. (2014). Construction Project Management (4th ed.). New York, USA: Pearson.
  12. Gauhati University Mathematics Association (2013). An investigation of bias on determination of sample size on the basis of data. International journal of applied Mathematics and statistical sciences 2(1), 19-45
  13. Jackson, S. L. (2012). Research methods and statistics: A critical thinking approach (4th ed.). Belmont, CA: Wadsworth/Cengage.
  14. Kapogiannis, G., & Sherratt, F. (2018). Impact of integrated collaborative technologies to form a collaborative culture in construction projects. Built Environment Project and Asset Management, 8(1), 24-38.
  15. Keller-Guenther,Y. & Betts, B.( 2011). Come together now: Measuring levels of collaboration. American Evaluation Association Annual Conference White Paper. Retrieved April 5, 2016, from www.university_of_collarado_denver>resources
  16. Koskela, L. J., & Howell, G. (2008). The Underlying theory of project management is obsolete. In Proceedings of the PMI Research Conference. IEE Engineering Management Review, 36(2), 22-34. Doi:10.1109/emr.2008.4534317
  17. Löfgren, P & Eriksson, P. E. (2009). Effects of collaboration in projects on Construction project performance. Retrieved February 20, 2016 from www.pure.ltu.se/collaborations_effect_on_project.pdf.
  18. Lu, W., Zang, D. & Rowlinson S. (2013). BIM collaboration: A conceptual model and its characteristics In S. D. Smith &, D.D. Ahiaga-Dagbui (Eds.), Proceedings of ARCOM conference, 2-4 September 2013, Reading, UK, Association of Researchers in Construction Management, pp25-34.
  19. McDermott, P. & Khalfan, M. (2006). Achieving supply chain integration in construction industry. Australian journal of construction Economics and Building, 6(2) 44. Doi:10.5130/ajceb/v6i2.2983
  20. Mickan S. & Rodger S. (2000). Characteristic of effective teams: A literature review. Retrieved February 21, 2016, from www.citeseerx.ist.psu.edu>viewdoc>download
  21. Mossman, A. (2013). Last Planner: 5+1 crucial and collaborative conversations for predictable design and construction delivery. Retrieved September 27, 2015, from http://www.bit.lv/LPS-5cc
  22. Onungwa I. O., & Uduma-Olugu, N. (2016). Emerging trends in construction organisational practices and project management knowledge area. 9th CIDB Postgraduate Conference, February 2-4, 2016, Cape Town, South Africa.
  23. Owolabi, O.S.B. & Olatunji, A.S. (2014). The roles of construction professionals in Nigeria's construction industry. IOS Journal of Humanities and Social Science 19 (11), 5-10.
  24. Pacer Centre (2004). Five levels of collaboration. Retrieved August 15, 2016, from www.pacer.org>session7>handouts
  25. Rotimi. J.O.B. (2015). Optimising and managing stakeholder opportunities and collaboration in the Nigerian Building industry. Proceedings of CORBON conference, 2-5 November, Abuja, Nigeria, Council of registered Builders of Nigeria 12-23.
  26. Roberts, M., Blundel, N., Dartnell, R. & Polynter-Brown, R. (2016). A critical review of theory and practice of collaborative working in construction. Retrieved May 16, 2016, from www.pinsetmasons>PDF>collaborative_construction
  27. Rowland, S. (2009). What is collaboration? Retrieved February 15, 2016, from www.neighbourhoodtransformation.net/wh/atiscollaboration.pdf
  28. Tee, R., Davies, A., & Whyte, J. (2019). Modular designs and integrating practices: Managing collaboration through coordination and cooperation. Research Policy, 48(1), 51-61.
  29. Tipili, L.G., Ojeba P.O. & Iliyasu M. S. (2014). Evaluating the effects of communication in construction project delivery in Nigeria. Global Journal of Environmental Science and Technology 2(5), pp48-54
  30. Thomsen, C. (2010). Managing integrated project delivery systems: Integrated practice – Process or product. Retrieved February 21, 2016 fromwww.cmaanet.org/managing_integrated_project_delivery_systems.pdf
  31. Vrijhoef, R., & Koskela, L. (2000). The four roles of supply chain management in construction. European Journal of Purchasing & Supply Management, 6(3), 169-178.
  32. Waibel, G. (2010). Collaboration contexts: framing local, group and global solutions. Report produced by OCLC Research. Retrieved February16,2016, from http://www.oclc.org/research/publications/library/2010/2010-09.pdf
  33. Wilkinson, P. (2005). Planning and implementing effective collaboration in construction industry. Retrieved April 5, 2016, from www.piecc.iboro.ac.uk/Results/flyer_v1.pdf
  34. Winch, G. M. (2007). Managing Project stakeholders. DOI:10.1002/9780470172391.ch14
  35. Wood, H. L. (2008). The factors of project complexity. Retrieved from February 17, 2016, from http://www.irbnet.de
  36. Zamina, D., and Pasquire, C. (2012). The Last Planner System Insights. The Report of Master of Class, 14, July, Centre for Lean Projects, Nottingham Trent university
  37. Zorich, D.M.; Waibel, G. & Erway, R. (2008). Beyond the silos of the iams: The collaboration continuum, among libraries, archives and museums. Retrieved September 14, 2016, from www.http://wwwoclc.org/resources/research/publications/library/2008-05.pdf
How to Cite

Molwus, J. J., Iorkumbur, J., & Izam, Y. D. (2019). COLLABORATION AMONG INTERNAL STAKEHOLDERS OF CONSTRUCTION PROJECTS IN NIGERIA. Journal of Contemporary Research in the Built Environment, 3(2), 17-29. https://doi.org/10.68128/jocrebe.2019.v9f3fy2p

J. J. Molwus, J. Iorkumbur, and Y. D. Izam, "COLLABORATION AMONG INTERNAL STAKEHOLDERS OF CONSTRUCTION PROJECTS IN NIGERIA," Journal of Contemporary Research in the Built Environment, vol. 3, no. 2, pp. 17-29, September 2019. doi: 10.68128/jocrebe.2019.v9f3fy2p

Share this article:
Facebook X / Twitter LinkedIn