CONTRACTORS’ CASH FLOW AND PROJECT DELIVERY IN AKWA IBOM AND RIVERS STATES, NIGERIA
1 Department of Building, Faculty of Environmental Studies, University of Uyo, Uyo, Nigeria
2 Department of Building, University of Uyo, Uyo, Nigeria.
* Corresponding author: dubemikediashi@uniuyo.edu.ng
2 Department of Building, University of Uyo, Uyo, Nigeria.
* Corresponding author: dubemikediashi@uniuyo.edu.ng
Abstract
Purpose: The aim of the study is to investigate the state of contractors’ cash flow and its
influence on construction project delivery in selected states of south-south Nigeria with a view
towards improving contractors’ cash flow. The study objectives are: to ascertain the influence
of project characteristics on contractors’ cash flow projections for construction projects and
assess the influence of contractors’ cash flow projection on project performance.
Design/methodology/approach: In line with quantitative survey approach adopted for the
study, 193 copies of a structured questionnaire were administered while 130 valid responses
were received, translating into a response rate of 67.4%. Data collected were analysed using
descriptive statistics and Kruskal Wallis. Findings indicate that the top three project
characteristics that had influence on cash flow are procurement method, project duration, and
client type while project type was rated the least.
Findings: Findings also reveal that “on schedule delivery of projects” was the top rated,
followed by “on budget delivery of projects”, and “projects delivered ahead of schedule”.
However, “projects delivered at an underrun” was the least rated. Findings also indicate that the
influence of contractor’s cash flow on 3 of the 6 project delivery indicators were not significant
as they did not meet the 3-point threshold. The study also concludes that the top three project
characteristics that have influence on contractor’s cash flow are procurement method (in terms
of traditional, design and build, project management etc.), project duration, and client type
(public or corporate).
Practical implications: The study recommends among others that government should enact
stringent laws and guidelines to punish parties to a contract that defaults on the issue of funding
of projects. This will address delay in project execution and other risks that could hamper project
delivery.
Originality/value: The study established that the top three project characteristics that have
influence on contractor’s cash flow are procurement method (in terms of traditional, design and
build, project management etc.), project duration, and client type (public or corporate); and that
good cash flow management of projects has the highest impact on timely delivery of projects.
Keywords
Cash flow; project characteristics; project performance; Nigeria.
References
- Al-Joburi, K.I., Al-Aomar, R., and Bahri, M.E. (2012). "Analysing the Impact of Negative Cash Flow on Construction Performance in the Dubai Area", Journal of Management in Engineering 28(4), 5-15.
- Akwaibomstate.gov.ng 2012. About Akwa Ibom State – Akwa Ibom State Government, accessed on June 24, 2020, www.akwaibomstate.gov.ng.
- Arditi, D, Almula, K. and Kale, S. (2000). "Business failure in construction industry". Journal of Engineering, Construction and Architecture Management, 7(2), 120-132.
- Barbosa, P.S.F. and Pimentel, P.R. (2001). "A linear programming model for cash flow management in the Brazilian construction industry", Construction Management and Economics, 19(5), (2001), 469-479.
- Chukwudi, U.S., and Tobechukwu, O. (2014). "Participation of Indigenous Contractors in Nigerian Public Sector Construction Projects and their Challenges in Managing Working Capital". International Journal of Civil Engineering and Estate Management (IJCECEM), 1(1), 1 – 21.
- Corbetta, P. (2003). Social Research Theory, Methods and Techniques, London SAGE Publications.
- Cooke, B. and Jepson, W.B. (1986). Cost and Financial Control for Construction Firms. London: Macmillan Educational Ltd. Pp. 25-26, 41-46.
- Creswell, J.W. (2009). Research design: Qualitative, Quantitative and Mixed Methods approaches, 3rd edition, Sage Publications, Thousand Oaks, London.
- Crosthwaite, D. (2000)." The Global Construction Market: a Cross Sectional Analysis". Construction Management and Economics, 18, 619-627.
- Ebiloma, D. (2017). Assessment of Building Information Modelling (BIM) usage for sustainable building projects in Akwa Ibom state. Unpublished Masters Dissertation, University of Uyo.
- El Razek, M.A., Hosny, H.E.D., and Beheri, A.E. (2014). "Risk Factors in Construction Projects Cash-Flow Analysis", International Journal of Computer Science Issues, 11(1&2), 69-78.
- Emidafe, W. (2016). 6 Ways Nigerian Construction Companies can Survive Naira Devaluation. Herald Sun. Retrieved from http://www.heraldsun.com.au/
- Hosseini, A., Andalib, R., and Gatmiri, B. (2015). "Stochastic Framework for Cash Flow Forecasting Considering Client's Delay in Payment by Use of Monte Carlo Simulation". 31st Annual International Conference Proceedings (AICP)
- Ikediashi DI. (2014). A framework for outsourcing facilities management services in Nigeria's public hospitals. Unpublished PhD thesis, Heriot-Watt University, Edinburgh.
- Ikediashi, D.I. and Ajiero, I.R. (2019). Housing affordability for the low income group in the Niger Delta region of Nigeria. Journal of Environmental design, 14(1), 56-69.
- Kaka, A.P. and Price A.D.F. (1993). "Modelling standard cost commitment curves for contractor's cash flow forecasting", Construction Management and Economics, 11, 271-283.
- Khrosrowshahi, F. (2000). "A radical approach to risk in project financial management". Proceedings of the 16th Annual ARCOM Conference, Glasgow Caledonia University, September 6-8, 547-556.
- Kothari, C.R. (2004). Research Methodology – methods and techniques, Second edition, New Age International Publishers, India.
- Ling, F.Y.Y. (2004). "Key Determinants of Performance of Design-Bid-Build Projects in Singapore", Building Research and Information, 32(2), 128–139.
- Lowe, J. G. (1993). "Construction Productivity, An input-output Approach", PhD, Thesis, Heriot-Watt University, Edinburgh.
- Marc, C., (2009), Finance and Control for Construction, Taylor and Francis
- Morris, P.W.G. and Hough, G.H. (1991). The Anatomy of Major Projects, A Study of the Reality of Project Management, John Wiley and Sons, Chichester, UK.
- Nwankpa, N.N. (2011). Nigerian newspaper coverage of militancy in the Niger Delta region and readers' perception. Unpublished PhD thesis, University of Uyo.
- Nwanyanwu, L.A. (2015). "Cashflow and Organisational Performance in Nigeria: Hospitality and Print Media Industries Perspectives" European Journal of Business, Economics and Accountancy, 3(3), 65-72.
- Odeyinka, H. A., Kaka, A. and Morledge, R. (2003). "An Evaluation of Construction Cash Flow Management Approaches in Contracting Organisations". Proceedings of the 19th Annual Association of Researchers in Construction Management (ARCOM) Conference, September 3-5, University of Brighton, pp 33-41.
- Ojo GK (2010): An assessment of risk impacts on construction clients' cash flow forecast, Unpublished PhD Thesis, Department of Quantity Surveying, Obafemi Awolowo University, Ile-Ife
- Ojo, G.K. (2012), "Project characteristics influence on risk associated with construction clients' cash flow prediction", Journal of Research in International Business and Management, 2(5), 142-150.
- Oxley, R. and Poskitt, J. (1996). Management techniques applied to the construction industry, 5th Edition. Blackwell Science, London, 134-164.
- Pallant, J. (2010). SPSS survival manual: a step by step guide to data analysis using SPSS for Windows, 3rd edition, Open University press, McGraw Hill, New York, NY
- Pandey, I.M (1979), Financial Management, New- Delhi, Vikas Publishing House PVT ltd.
- Pinto, J. K. and Slevin, D. P. (1988). Project success: definitions and measurement techniques. Project Management Journal, 19(1), 67-73.
- Project Management Institute (PMI) (2004). A Guide to the Project Management Body of Knowledge. 3rd Edition, Newton Square, PA.
- Ritchie, B. and Marshall, D. (1993). Business Risk Management, Chapman and Hall, London, 1993.
- Ruben, F. and Ger M (2008). Ranking construction project characteristics, in CIB Transformation through construction, C. Carter, S. Ogunlana and A. Kaka eds., pp1-8, available at http://rubenfavie.com/media/1669/cib2008_ranking%20construction%20project%20characteristics.pdf [accessed on 8th Dec 2017].
- Samset, K. (2003). Project Evaluation. Making Investments Success. Tapir Academic Press: Trondheim.
- Sanusi, D. (2008). General Overview of the Nigerian Construction Industry. M.Sc Thesis. B.S., Massachusetts Institute of Technology, USA.
- Saunders, M., Lewis, P. and Thornhill, A. (2009), Research methods for business students, 5th edition, Pearson Education Limited, Essex, UK.
- Smith, N.J. (2008). Engineering Project Management, Third Edition, Blackwell Publishing.
- Udofia, P.E. (2011). Applied statistics with multivariate methods, 1st edition, Immaculate Publications limited, Enugu, Nigeria.
- VETIVA, (2011), Construction Industry Report: A haven of opportunities. A publication of VETIVA Capital Management Limited, May 2011.
- World Bank, (2013), Nigeria Economic report May 2013, available at www-wds.worldbank.org accessed on April 05, 2014.
- Usman, N., Sani, A., and Tukur, R.I. (2016). "An Appraisal of Factors Affecting Cash flows in Building Project Delivery in Nigeria". International Journal of Research and Development Organisation, 2(2),
- Westland, J. (2006). The Project Management Life Cycle a complete step-by-step methodology for initiating, planning, executing & closing a project successfully, (http://www.netLibrary.com).
- Yamane, T. (1967), Statistics: An introductory analysis, 2nd edition, New York: Harper and Row.
How to Cite
Ikediashi, D. I., Ajiero, I. R., & Ohaka, R. . N. (2019). CONTRACTORS’ CASH FLOW AND PROJECT DELIVERY IN AKWA IBOM AND RIVERS STATES, NIGERIA. Journal of Contemporary Research in the Built Environment, 3(2), 74-91. https://doi.org/10.68128/jocrebe.2019.uh04v7ae
D. I. Ikediashi, I. R. Ajiero, and R. . N. Ohaka, "CONTRACTORS’ CASH FLOW AND PROJECT DELIVERY IN AKWA IBOM AND RIVERS STATES, NIGERIA," Journal of Contemporary Research in the Built Environment, vol. 3, no. 2, pp. 74-91, September 2019. doi: 10.68128/jocrebe.2019.uh04v7ae