Abstract
Purpose: The study identified critical success factors associated with TQM
implementation for construction projects in south-south Nigeria and explored their
underlying factors by categorising the critical success factors using principal component
analysis (PCA) Design/Methodology: Anchored on quantitative questionnaire survey approach, 91 copies
of the structured questionnaire were distributed while 50 valid responses were retrieved
giving a response rate of 55%. Data were analysed using descriptive statistics, Mann
Whitney U-test, and principal component analysis.
Findings: Findings revealed that customer satisfaction, top management commitment to quality processes, benchmarking, maintaining quality culture and design quality management were ranked top five (5) CSFs associated with TQM implementation for construction projects by respondents in the study while factor analysis conducted produced 7 components. The hypothesis postulated for the study was accepted because the p-value was greater than 0.05 which meant that there was no significant difference in the perception of respondents on the CSFs associated with TQM implementation practices between Akwa Ibom and Rivers States. Research Implications: It was recommended among others that, construction companies as well as stakeholders should take strategic measures in ensuring that customer satisfaction, top management participation and commitment to quality process and maintaining quality culture were given priority as they were the key CSFs for implementing TQM practices. Original Value: The study produced a model of critical success factors which was the first in the south-south geopolitical zone of Nigeria.
Findings: Findings revealed that customer satisfaction, top management commitment to quality processes, benchmarking, maintaining quality culture and design quality management were ranked top five (5) CSFs associated with TQM implementation for construction projects by respondents in the study while factor analysis conducted produced 7 components. The hypothesis postulated for the study was accepted because the p-value was greater than 0.05 which meant that there was no significant difference in the perception of respondents on the CSFs associated with TQM implementation practices between Akwa Ibom and Rivers States. Research Implications: It was recommended among others that, construction companies as well as stakeholders should take strategic measures in ensuring that customer satisfaction, top management participation and commitment to quality process and maintaining quality culture were given priority as they were the key CSFs for implementing TQM practices. Original Value: The study produced a model of critical success factors which was the first in the south-south geopolitical zone of Nigeria.
Keywords
Success factors
quality management
factor analysis
Nigeria.
References
- Adenuga, O. (2013). Facts affecting Quality in the delivery of public Housing Projects in Lagos, Nigeria. International Journal of Engineering and Technology, vol. 3. (24-37)
- Arditi, D. and Murat, G. (1997). Total quality Management in the Construction Process. International Journal of project management, Vol. 15. No. 4.
- Bani Ismail, Loiy (2012). An evaluation of the implementation of Total Quality Management (TQM) within the construction sector in the United Kingdom and Jordan. Doctoral thesis, university of Huddersfield.
- Barkley, B. and Saylor, J. (1994) "Customer-Driven Project Management, McGraw-Hill, New York.
- Black, A.S. and Porter, L.J. (1996) Identification of the Critical Factors of TQM. Journal of Decision Sciences, 27, 1-21.
- Bello, A., Soyingbe, W. and Akinwanide, O. (2012). Sancrete Blocks and quality management in Nigeria building Industry. Journal of engineering project and production management, vol.3, 37-46.
- Dahlgaard, J., Kristensen, K. and Gopal, K. (1992). Process analysis and improvement: Fundamentals of Total Quality Management. Cambridge: Cambridge University Press.
- Egan, J. (1998). Rethinking construction: Report of the construction test force on the scope for improving the quality and efficiency of UK construction. London: DETR.
- Farooqui, R., Masood, R., and Aziz, J. (2008). Assessing the viability of total quality management implementation in constructing firms of Pakistan Construction industry. Pakistan: Karachi.
- Gadenne, D., and Sharma, B. (2009). An investigation of the hard and soft quality management factors of Australian SMEs and their association with firm performance. International Journal of Quality and Reliability Management, 26(9), 865-880
- Garvin, D.A. (1988) Managing Quality: The Strategic and Competitive Edge. The Free Press, New York.
- Iruobe, S., Ojamibati, M. and Akinpade (2012). Impact of TQM application in construction industry. Cambridge: Cambridge University Press.
- Jackson, C. (2004). Quality management in construction industry. The TQM Journal, 16(3). 167.
- Jaafreh, Ali and Abedalfattah, A. (2013). The effect of Quality Management Practices on Organizational Performance in Jordan an Empirical Study. International Journal of Financial Research. Vol. 4, No. 1, January 2013
- Johnson, A. (1987). Understanding the obstacles to TQM success. Quality Management Journal, 10(3), 45-56.
- Juran, J. M. (1988). Juran's quality control handbook, 4thed. New York: McGraw-Hill.
- Kasongo K. and Moono M. (2010). Factors that lead to a successful TQM implementation: A case study on the Zambian Tourism industry. Cambridge University Journal, 21(3). 66.
- Kothari, (2004). Research Methodology: Methods and Techniques. New Age International (P) Ltd. 2(3). 34.
- Lathem, M. (1994). Constructing the Team HMSO, London, UK.
- Nair, A. and Boulton, W. (2008). "Innovation oriented operations strategy typology and stage based model". International Journal of operations and production management, Vol. 28, No. 8, pp. 748-771.
- Oakland J. (1993). Total Quality Management: The route to improving performance, (2nd ed.). Butterworth: Heinemann Ltd.
- Oakland, J. and Marosszeky, M. (2006). Total Quality in the Construction Supply Chain. Jordan Hill, Oxford: Elsevier Ltd.
- Osayawe, E. B. and McAndrew, E. B. (2005). Innovation, diffusion and adoption of total quality management (TQM).Management Decision 43(6), pp. 925-980.
- Peter, M. (2001). Updating the project management bodies of knowledge. Project Management Journal, Vol. 32(3). Pp. 21-30.
- Powell T. C. (1995). Total Quality management as competitive advantage: A review and empirical study.
- Prayugo, I. and Sohal S. (2006). The Relationship Between Organisation Strategy, Total Quality Management (TQM) and Organisational Performance: the mediating role of TQM. Operational Res. 168:35-50
- Salaheldin S. I. (2009). Critical success factors for TQM implementation and their impact on performance of SMEs. International Journal of Productivity and Performance Management. 58(3), 215-237.
- Saraph, J.V., Benson, P.G., and Schroeder, R.G. (1989). An instrument for measuring the critical factors of quality management. Journal of Decision Science, 20(4), 810-829.
- Udofia, G. A. (2011). Introduction to Theories of Sampling Techniques and Methods. Calabar: UB Printing Press.
- Yamane, T. (1967), Statistics: An introductory analysis, 2nd edition, New York: Harper and Row
How to Cite
Ikediashi, D. I., & Owoefiak, W. O. (2021). CRITICAL SUCCESS FACTORS ASSOCIATED WITH TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION FOR CONSTRUCTION PROJECTS IN NIGERIA. Journal of Contemporary Research in the Built Environment, 5(1), 72-87. https://doi.org/10.68128/jocrebe.2021.m905ovhc
D. I. Ikediashi, and W. O. Owoefiak, "CRITICAL SUCCESS FACTORS ASSOCIATED WITH TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION FOR CONSTRUCTION PROJECTS IN NIGERIA," Journal of Contemporary Research in the Built Environment, vol. 5, no. 1, pp. 72-87, March 2021. doi: 10.68128/jocrebe.2021.m905ovhc