EFFECTS OF OVERHEAD COST OF CIVIL ENGINEERING PROJECTS IN NIGERIA
1 Department of Quantity Surveying, University of Benin, Benin-City, Edo State
* Corresponding author: chukwuemeka.ogbu@uniben.edu
* Corresponding author: chukwuemeka.ogbu@uniben.edu
Abstract
Purpose: “General items” is an important cost center in civil engineering projects given the
complexities of facilitative works and support services that are normally required in such
projects. However, extant literature makes little or no difference between preliminaries in
building projects and general items in civil engineering projects. This study, which focuses on
overhead costs in civil engineering projects, was carried out to: (1) assess the factors affecting
overhead cost of civil engineering projects, (2) determine the relationship between the factors
and the overhead costs of civil engineering projects and; (3) determine the frequency of use of
overhead cost items in civil engineering projects.
Design/methodology/approach: Respondents were conveniently selected from civil/structural
engineers and quantity surveyors who have participated in civil engineering projects (n=73) in
Nigeria. The data were analyzed using percentages, relative importance index, multiple
regression and factor analysis.
Findings: It was found that the most important factor affecting the overhead cost of civil
engineering projects is delayed payment. Based on factor analysis, it was concluded that the
factors affecting overhead costs of civil engineering projects are either project or contractor
related. These two groups of factors were found to have significant effects on the overhead cost
of civil engineering projects. Provisions for water supply, setting out and handover were found
to be the predominant general items allowed in civil engineering projects. The possibility of
payment delays should be assessed while estimating the cost of general items, and only
applicable general items should be priced.
Research limitations/implications: Many types of civil engineering projects were considered
in this study. Future studies may look at how overhead costs differ for different types of civil
engineering projects.
Social implication: Delayed payment avoidance by the government will have a positive effect
on the overhead and, ultimately, the overall costs of civil engineering projects.
Originality/value: This study ascertained the frequency of use of general items in civil
engineering projects. It also determined the domains of the variables that affect the overhead
cost of civil engineering projects. Most previous studies on construction project overhead costs
were based on building projects
Keywords
Civil engineering projects; general items; overhead cost; preliminaries.