Research Article

EVALUATING CAUSES OF CHANGE IN BUILDING CONSTRUCTION PROJECTS

1 Department of Building, University of Uyo, Uyo, Nigeria
* Corresponding author: femifavour.ff@gmail.com
Published: Sep, 2019
Pages: 101-120
Views: 29
Downloads: 6

Abstract

Purpose: Change in building construction project is inevitable and can occur at any stage, it has different source and reason due to involvement of many participants. Therefore, the study gives insight into causes of these changes and its consequences on building project performance. Design/methodology/approach: Descriptive and survey research method was used to evaluate the perception of construction participants and stakeholders to evaluate significant causes of change and effects of change order on performance of building construction projects. 125 well structured, cross-sectional questionnaires were distributed and data obtained were analysed using descriptive, relative importance index and Kruskal-Walis tests. Findings: Feedback from the respondents revealed the most significant causes of change in building construction projects to include change of plans by owners followed by change in design, poor communication among the construction participants, owners’ financial difficulties and owners’ change of schedule. Further findings on the effect of change order on the performance of building construction projects shows that on the general notes, cost overrun is the most prevalent effect followed by quality standard enhanced, time overrun, additional money for contractor overhead and work-on-hold (in descending order). Research limitation/implications: This study is limited in scope to all such building construction projects in the study area (public buildings, commercial, hospital and others), also restricted to the opinion of 104 participants who duly completed and return their questionnaire. It has found that managing changes at project level is a critical problem faced by the construction industry. An understanding of the causes of change (that leads to change order) would be helpful for building construction professional and participants in managing change/variation orders. Practical implications: Introduction of change management procedure in the contract document will enhance smooth delivery of building projects with less disputes. The change will be managed to maximise the benefit and minimise penalties. It is also recommended that the Ministries (federal and state) in charge of housing should establish or have a well-defined system of managing changes in Government building construction projects rather than abrupt calling for unjustified variation by their contractors or suppliers. Originality/value: The study highlighted and established changes in building construction projects and the effects of change order on performance only in Akwa Ibom state. 

References

  1. Al-dubaisi, A. H. (2000). Change Orders in Construction Projects in Saudi Arabia, M.Sc. Thesis. The College of Graduate Studies, KFUPM. Dhahran, Saudi Arabia.
  2. Anees, M. M. (2012). Evaluation of Change Management Efficiency of Construction's Contractors, M.Sc. Thesis, College of Engineering and Technology, Arab Academy for Science, Technology and Maritime Transport AASTMT, Cain, Egypt.
  3. Anees, M. M., Mohamed, H. E. and Abdel Razek, M. E. (2012). Evaluation of Change Management Efficiency of Construction Contractors, Journal of Housing and Building National Research Center (HBRC), (8): 77-85.
  4. Arain, F. M. (2008). I. T.-Based Approach for Effective Management of Projects Change: A Change Management System (CMS), Advanced Engineering Information, 22 (4): 457 - 472.
  5. Arain, F. M. and Pheng, L. S. (2005). The Potential Effect of Variation Orders on Institutional Building Projects Facilities, 23 (11/12): 496 - 510.
  6. Arain, F. M. and Pheng, L. S. (2007). Modeling for Management of Variation in Building Projects, Engineering Construction and Architectural Management, 14 (5): 421 - 433.
  7. Arian, F. and Low, S. (2005). Strategic Management of Variation Order for Institutional Building: Leveraging on Information Technology, Project Management Institute, 36 (4): 27 - 41.
  8. Burnes, B. (1996). No. Such Thing as...a "One Best Way" to Manage Organisational Change, Management Decision, 34 (10): 11 - 18.
  9. Charoenngam, C., Coquinco, S. T. and Hadikusumo, B. H. W. (2003). Web-based Application for Managing Change Order in Construction Projects. Construction Innovation: Information, Process, Management, (3):197-215.
  10. Concise Oxford Dictionary (1990) 8ed, ed R. E. Alien.
  11. Construction Industry Institute (CII), (2011). Benchmarking and Metrics. Available at: file:///D:/computer%20data%2011-1 2011/master%20thesis/Paper1/master%20thesis-/reference/USED/33/Construction%20Industry%20Institute.htm> (accessed January, 2011). .
  12. Construction Industry Institute (CII) (1994) Project Change Management, special Pub. 43 - 51.
  13. Duaij, J., Awida, T. and Kollarayam, A. (2007). Performing Value Analysis on Construction Project Variation Orders, Journal of Cost Engineering, 49 (6): 23 - 27.
  14. EPSRC, Engineering and Physical Sciences Research Council Industrial Report (2005) Managing Changes In Construction Projects.
  15. Erdogan, B., Anumba, C., Bouchlaghem, D. and Nielsen, Y. (2005). Change Management in Construction: The Current Context, 21st Annual Conference, Association of Researchers in Construction Management (ARCOM), (2): 1085 - 1095.
  16. Faniran, O. O., Love, P. E. D., Treloar, G. and Anumba, C. J. (2001). Methodological Issues in Design-Construction Integration, Logistics Info Management, 14 (5/6): 421 - 426.
  17. Hanna, A. and Swanson, J. (2007). Risk Allocation by Law - Cumulative Impacts of Change Orders, Journal of Professional Issues in Engineering Education and Practices, 133 (1): 60 - 66.
  18. Hanna, A., Camlic, R., Peterson, P. and Lee, M. (2004). Cumulated Effect of Project Changes for Electrical and Mechanical Construction, Journal of Construction Engineering and Management, 130 (6): 762 - 771.
  19. Hester, W., Kuprenas, J. and Chang, T. (1991) "Construction Change and Change Orders: Their Magnitude and Impact", Austin: Construction Industry Institute (CII).
  20. Heywood, C. and Smith, J. (2006). Integrating Stakeholders During Community FM's Early Project Phases. Facilities, 24 (7/8): 300 - 313.
  21. Hsieh, T., Lu, S. and Wu, C. (2004). Statistical Analysis of Causes of Change Order In Metropolitan Public Works, International Journal of Project Management, 22: 679-686.
  22. Huang, G. Q., Yee, W. Y. and Mak, K. L. (2001). Development of A. Web-based System for Engineering Change Management, Robotics and Computer Integrated Manufacturing, 17: 255 - 267.
  23. Ibbs, C. (1997). Quantitative Impacts of Project Change: Size Issues, Journal of Construction Engineering and Management, 123 (3): 308 - 311.
  24. Ibbs, C. W., Wu, C. K. and Kwak, Y. H. (2001). Project Change Management System, Journal of Management in Engineering, 17 (3): 159 - 165.
  25. Ibbs, W., Nguyen, L. and Lee, S. (2007). Quantified Impacts of Project Change, Journal of Professional Issues in Engineering Education and Practice, 133 (1): 45 -52.
  26. Isaac, S. and Navron, R. (2009). Modeling Building Projects as a Basis for Change Control, Automation in Construction, 18 (5): 656 - 664.
  27. Jarratt, T. A. W., Eckert, C. M., Caldwell, N. H. M. and Clarkson P. J. (2011). Engineering Change: An Overview and Perspective on the Literature, Research in Engineering Design, 22 (2): 103 - 124.
  28. Jaud, R., Bin Abdukader, M. R. and Abang Ali, A. A. (2009). Variation Orders in Construction Projects, Journal of Engineering and Applied Sciences, 4(3): 170-176.
  29. Keaned, P., Sertyesilisik, B. and Ross, A. (2010). Variation and Change Orders on Construction Projects, Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2 (2): 89 -96.
  30. Kitchen, P. J. and Daly, F. (2002). International Communication during Change Management, Corporate Communications, 7 (1): 46 - 53.
  31. Lau, H. Y. K., Mak, K. L. and Lu. M. T. H. (2003). A Virtual Design Platform for Interactive Product Design and Visualisation, Journal of Material Processing Technology, 139: 402 - 407.
  32. Lazarus, D. and Clifton, R. (2001). Managing Project Change: A Best Practice Guide, CIPRIA (556), London. UK.
  33. Lee, S., Hanna, A. and Loh, W. (2004). Deasion Treu Approach to Classify and Quantify Cumulative Impact of Change Orders on Productivity, Journal of Computing in Civil Engineering ASCE, 18/2: 132 - 144.
  34. Love, P. E. D. and Li, H. (2000). Quantifying the Causes and Cost of Rework In Construction, Construction Management and Economic, 18: 479 -490.
  35. Love, P. E. D., Itolt, G. D., Shen, L. Y., Li, H. and Irani, Z. (2002). Using System Dynamics to Better Understand Change and Rework in Construction Project Management Systems, International Journal of Project Management, 20:425-436.
  36. McLeod, S. (2008). Simply Pychology. [Online] Available at: https://www.simplypsychology.org/likert scale.html [Accessed 04 08 2019].
  37. Motawa, I. (2005). A Systematic Approach to Modelling Change Processes in Construction Projects, Australian Journal of Construction Economics and Building, 5 (1): 23-31.
  38. Motawa, I. A., Anumba, C. J., Led. S. and Pena-Mora, F. (2007). An Integrated System for Change Management in Construction, Automation in Construction, 16 (3): 368 - 377).
  39. Nahod, M. M. (2012). Scope Control through Managing Changes in Construction Projects, Ph.D. Thesis, Construction Management Department, Faculty of Civil Engineering, Croatia.
  40. Ndihokubwayo, R. and Haupt, T. (2009). Variation Orders on Construction Projects: Value Adding or Waste, International Journal of Construction Project Management, (IJCPM) 1 (2): 1-17.
  41. Odusami, K. and Olusanya, O. (2000). Clients Contribution to Delay on Completion Cost Housing Projects in Nigeria: The Quantity Survey of Nigeria, Journal of Construction and Management, 2 (1): 81 - 86.
  42. Rouibah, K. and Caskey, K. R. (2003). Change Management in Concurrent Engineering from A Parameter Perspective, Computers in Industry 50: 15-34.
  43. Serag, E., Olufa, A., Malon, L. and Radwan, E. (2010). Model for Quantifying the Impact of Change Order on Project Cost for U.S. Roadwork Construction, Journal of Construction Engineering and Management, 136 (9): 1015 - 1027.
  44. Users' Guide (2005). Understanding and Monitoring the Cost - Determining Factors of Infrastructure Project.
How to Cite

Olasunkanmi, F. O., & Oladokun, M. G. (2019). EVALUATING CAUSES OF CHANGE IN BUILDING CONSTRUCTION PROJECTS. Journal of Contemporary Research in the Built Environment, 3(2), 101-120. https://doi.org/10.68128/jocrebe.2019.roqb6wo1

F. O. Olasunkanmi, and M. G. Oladokun, "EVALUATING CAUSES OF CHANGE IN BUILDING CONSTRUCTION PROJECTS," Journal of Contemporary Research in the Built Environment, vol. 3, no. 2, pp. 101-120, September 2019. doi: 10.68128/jocrebe.2019.roqb6wo1

Share this article:
Facebook X / Twitter LinkedIn