Abstract

Purpose: Cost deviation from initial cost plan, has been prevalent in construction projects and the issue calls for serious concern. It is against this background that this study made attempt to investigate factors responsible for this phenomenon despite past research efforts. Design/methodology/approach: Purposive sampling method was used to collect data from primary source consisting of structured questionnaire designed on Likert scale in rating of 1 to 5. The field survey was carried out with 80 questionnaire distributed to the professionals handling public construction building projects in Abuja and a response rate of 68 questionnaire returned was used for the analysis. The data collected was analysed using statistical package (SPSS). Findings: It was discovered from the data analysis that delayed payments to contractors, inflation, fraudulent practices, and inadequate financial planning are top critical factors contributing to poor cost performance. In addition, mobilisation of financial resources in advance, proper and realistic planning, efficient estimation process, training on value management, change management and procurement management are also crucial to minimise poor cost performance in construction industry. Originality/value: The study concludes with recommendations that payments should be made to contractors without delay, decision making on projects should always be fast tracked, establishment of preventive measures against unethical practices should be in place. Management should focus more on human resource related issues and adequate planning using modern technology these could serve as mitigating measures for minimising poor cost performance in construction projects.

References

  1. Ayodele, E.O. (2011). Abandonment of Construction Projects in Nigeria. Journal of emerging trends in Economics and Management Sciences, 2(2), 142-145.
  2. Doloi, H. (2013). Cost Overruns and Failure in Project Management: understanding the roles of key Stakeholders in Construction Projects. Journal of Construction Engineering and Management. 139, 267-279.
  3. Eshofonie, E.F. (2008). Factor Affecting Cost of Construction in Nigeria. Journal of construction Engineering and Management, 9(4) 68-73.
  4. Helen, I.B & Oyewale J.O (2016). An Investigation into Factors Affecting the Performance of Public Construction Projects in Ondo State, Southwestern Nigeria. Journal of Civil and Environmental Research. 8(1).
  5. Iheme C.C. & Chiagwon C.F Construction Industry and its Constraints in Nigeria. International Journal of Advanced Research in Social Engineering and Development Strategies online, 5(1), 2354-161.
  6. Kasimu, M. A. (2012). "Significant Factors that Causes Cost Overrun in Building Construction Project in Nigeria", Interdisciplinary Journal of Contemporary Research in Business, 3, (11), 775-700.
  7. Nasiru, Z.M, Kunya, S.U, and Abdulrahman M., (2012). Assessment of Factors that affect cost control by Nigerian Contractors. Journal of Engineering and Applied Science, 4(1) 32-37.
  8. Malumfashi, B.I & Shuaibu, I. (2012). Risk Management and Cost Overrun in Infrastructure Projects in Nigeria. Journal of Environmental Sciences and Policy Evaluation, 2(2), 19-31.
  9. Mamman and Omozokpia (2014). An Evaluation of Factors Affecting the performance of construction Projects in Niger State. Journal of Environmental Science and Resources Management. 6(1), 34-43.
  10. Memon, Aftab Hameed., Rahman, Ismail Abdul. & Azis, Ade Asmi Abdu. (2011). "Preliminary Study on Causative Factors Leading to Construction Cost Overrun", Journal of Sustainable Construction Engineering & Technology, 2(1), 57-71.
  11. Muralidaran, R. (2018). An Investigation into Cost Overrun in Construction Projects in United Arab Emirates. International Journal of Construction Engineering and Management, 7(1), 1-21.
  12. Olawale, Y.A. & Sun, Ming. (2010). "Cost and Time Control of Construction Projects: Inhibiting Factors and Mitigating Measures in Practice", Construction Management and Economics, (20), 5, 509- 526.
  13. Ramanathan, C., Narayanan, S. P. & Idrus, A. B. 2012. Construction delays causing risks on time and cost – a critical review. Australasian Journal of Construction Economics and Building. 12: 37–57.
  14. Saleh A. T. (2009): "Causes of Delay in Construction Projects in Libya". The International Conference On Economics & Administration, Faculty of Administration and Business University of Bucharest Romania; ICEA- FAA Bucharest.
How to Cite

Adeagbo, D. O. (2019). FACTORS AFFECTING COST PERFORMANCE OF CONSTRUCTION PROJECTS IN ABUJA, NIGERIA. Journal of Contemporary Research in the Built Environment, 3(1), 131-139. https://doi.org/10.68128/jocrebe.2019.kcnwq8jp

D. O. Adeagbo, "FACTORS AFFECTING COST PERFORMANCE OF CONSTRUCTION PROJECTS IN ABUJA, NIGERIA," Journal of Contemporary Research in the Built Environment, vol. 3, no. 1, pp. 131-139, March 2019. doi: 10.68128/jocrebe.2019.kcnwq8jp

Share this article:
Facebook X / Twitter LinkedIn