IMPACT OF PAYMENT PROBLEMS ON THE PERFORMANCE OF MICRO, SMALL AND MEDIUM SIZE CONSTRUCTION CONTRACTORS
1 Department of Quantity Surveying, University of Uyo, Uyo, Akwa Ibom State, Nigeria
2 Department of Building, Akwa Ibom State Polytechnic, Ikot Ekpene, Nigeria
* Corresponding author: christianfidelisasuquo@jocrebe-uu.com
2 Department of Building, Akwa Ibom State Polytechnic, Ikot Ekpene, Nigeria
* Corresponding author: christianfidelisasuquo@jocrebe-uu.com
Abstract
Purpose: Prompt payment has serious implication for the success of construction contracts, and
this is particularly so where smaller construction contractors are involved since they rely heavily
on cash flow to sustain their business operations. Despite the existence of contractual provisions
and legislations, payment problems are still endemic in the construction industry. The study was
therefore undertaken to investigate the causes of payment problems, and their impact on the
contractual and business performance of micro, small and medium size construction contractors.
Design/methodology/approach: Sixty-two (62) construction contractors in Akwa Ibom State
in the micro, small and medium size category were surveyed using a well-structured
questionnaire.
Findings: The result reveals that the practice of pay-when-paid, delay in certification of interim
payment, involvement of too many parties in the process of honouring certificate and failure to
agree on valuation of work done rank as important factors responsible for payment problems.
In addition, increase in the construction costs, decrease in contractors’ profitability and delay in
project completion time rank as the major effect of payment problems. The study also concludes
that there is no difference in the perception of micro, small and medium-sized firms on the
impact of payment problems.
Originality/value: In spite of the importance of smaller contractors in the construction
economy of Nigeria, studies on payment problems affecting this financially weak and
vulnerable segment of the construction sector are scarce. Investigation of the important factors
responsible for payment problems would provide insight to construction industry stakeholders
in devising mitigating measures. Overall, this will improve the efficiency, sustainability and
viability of the construction sector.
Keywords
Construction contractors; contingent payment; payment problems; performance; profitability
How to Cite
Asuquo, C. . F., & Effiong, E. F. (2017). IMPACT OF PAYMENT PROBLEMS ON THE PERFORMANCE OF MICRO, SMALL AND MEDIUM SIZE CONSTRUCTION CONTRACTORS. Journal of Contemporary Research in the Built Environment, 1(1), 35-46. https://doi.org/10.68128/jocrebe.2017.puffjmsi
C. . F. Asuquo, and E. F. Effiong, "IMPACT OF PAYMENT PROBLEMS ON THE PERFORMANCE OF MICRO, SMALL AND MEDIUM SIZE CONSTRUCTION CONTRACTORS," Journal of Contemporary Research in the Built Environment, vol. 1, no. 1, pp. 35-46, March 2017. doi: 10.68128/jocrebe.2017.puffjmsi