Purpose: This research is steered towards developing models for predicting the quantity of
material waste generated during construction stage of building projects employing in-situ
construction method and the comparison of predicted quantity with the actual waste generated
on site.
Design/methodology/approach: The data used for the development of the models were
sourced from thirty on-going projects through research assistants for six-month period
consisting of one hundred and fifty cases of measurement of material waste. Standard multiple
regression was utilised to develop the models. To test the accuracy of the developed models,
paired sample t-test was used to compare the actual waste and the predicted quantity of waste.
Findings: The model for concrete work in slab embraced three predictors: the theoretical
quantity for work done, building gross floor area and the amount of rainfall accounting for
44.36%, 5.95% and 2.50% of the variance in the waste generated during concrete works in slab
respectively. While the model for predicting waste generation during blockwork comprises of
theoretical quantity of block for work done, the height from floor and the area of site
undeveloped explaining 43.82%, 10.82% and 2.28% of the variance in the waste generation of
block work respectively.
Research limitations/implications: The results of this study are limited to new projects
adopting in-situ construction method. Practitioners in the building industry within the study
area can predict the amount of material waste anticipated in low rise construction with good
accuracy using the developed models.
Originality/value: This study revealed that material waste generation on building sites is
predictable. There is no significant difference between the actual material waste generated on
site and the predicted quantity using the developed models.
Keywords
Actual waste; developed models; low-rise building; material waste; predicted waste